In the Czech city of Olomouc, BRUGG Pipes implemented a modern heat supply for the "ZOO Olomouc Loděnka" project. The goal was the efficient connection of a new aquarium building to the existing heating station within the zoo area.
As an infrastructure expert, BRUGG Pipes supplied 560 metres of the flexible ARMOPEX 63/126 pipe system. The challenging route ran along the flamingo enclosure, around the giraffe area and through a 70-metre stretch of woodland. Despite these complex conditions, the project was implemented efficiently thanks to the high system flexibility. Our partner PEZ Pipes installed the pipes within just two to three days. The decision to choose BRUGG Pipes was based on outstanding product quality, attractive conditions and on-site technical support. Reliability and adherence to schedules ensured the success of this partnership.